Laserfiche WebLink
VOLUME XI-GOB PILE#3 <br /> Appendix A <br /> Coal Mine Waste Disposal Area <br /> Salvage Volumes <br /> Area *Topsoil Topsoil <br /> Acres I Depth Ft. CY <br /> Coverfill Pile-West 3.3 1.1 6,051 <br /> Coverfill Pile-East 1.0 _ 1.1 1,747 <br /> Coal Mine Waste Pile 15.2 1.1 27,956 <br /> Totals 19.44' 35,754 <br /> Reclamation Volumes <br /> Area Topsoil Topsoil From Cover(Req'd) Total <br /> Acres _ Depth Ft. _ CY_ Stockpile CY (Req'd) <br /> Initial 50 Foot Bench 5.5 1.1 9,761 9,761 25,733 _ - <br /> Top of Pile 9.71 1.1 17,2141 17,214 45,383 <br /> Coverfill Pile 1.0 0.5 766 766 n/a <br /> Non-gob pile related reclamation areas 8.6 0.5 6,937 6,937 - n/a <br /> Totals 24.75 34,679 34,679 71,116 105,794 <br /> Coverfill Material Balance:' <br /> Coverfill in stockpile,available for reclamation: 52,564 <br /> Coverfill to be salvaged to complete reclamation: _ 18,552 <br /> Total: 71,116 <br /> ' I <br /> In-Place; In-Place; <br /> Volume Salvaged TOTAL: <br /> CY CY <br /> Coverfill Available for reclamation: <br /> COVERFILL STOCKPILE- - 52,564 52,564 Cover - - <br /> Coverfill necessary to complete reclamation,Gob Pile#2 and Gob Pile#3: <br /> Coverfill necessary for gob pile#3, 18,552 <br /> Coverfill necessary for gob pile#2(see Volume Ix,App.A) 30,000(shown on Appendix A,volume Do - <br /> Subtotal:1 48,552 **** <br /> i <br /> TOTAL Topsoil(In-place and to be salvaged): <br /> CY <br /> TOPSOIL PILES"F",(In Place,From UTL)*** 52,865 88,325 Topsoil <br /> TOPSOIL PILES"Fl",(Newly Salvaged)** 35,460 <br /> NOTES.• _ <br /> * UNIFORM TOPSOIL DEPTH ASSUMED IN ORDER TO MATCH QUANTITY CALCULATED <br /> PLEASE SEE VOL UMEXI,SECTION'RECLAMATION"FOR A DISCUSSION OF THE SALVAGE vs.ACTUAL TOPSOIL VALUES <br /> **6,500 CYADDED TO PREVIOUS TOTAL OF 28,424 CY based on 04/09/2014 in-field survey <br /> ***TOPSOIL TO BE USED FOR RECLAMATION AT UNIT TRAIN LOADOUT,NOT GOB PILE#3(See volume XlFigure 1 fordetads) <br /> ****AMOUNT EQUATES TO SALVAGE DEPTH OF 15.0'IN FOOTPRINT OF GOB PILE#3 WHERE EAST DRYING AREA— <br /> IS CURRENTLY LOCATED NN IF NECESSARY,SALVAGE DEPTH COULD_BE INCREASED TO PROVIDE ADDITIONAL <br /> COVERFILL FOR RECLAMATION OF GOB PILES 2-4. <br /> TR-118 App.A 04/19 <br />