Laserfiche WebLink
16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br /> cost the State of Colorado using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(18.5%) percent of that <br /> total,which includes a private contract, typical overhead costs and profit. <br /> Direct Cost: <br /> i. Backfilling: (cubic yards) X $ (cost per yard)=Total$ <br /> ii. Grading: (cubic yards)X $ (cost per yard) =Total $ <br /> Ili. Topsoil: (cubic yards) X $ (cost per yard)=Total $ <br /> iv. Seeding: 0, 0 r7 (acres)X $ (cost per acre)=Total $ <br /> v. Mobilization: (Pieces of equipment) X$ (cost per equipment) _4 <br /> Total <br /> Direct Cost Subtotal: $_ • S <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: $ D S <br /> Note: Based on the Division's experience the required financial warranty is normally set at <br /> approximately$2,500 per acre. Therefore, a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,500. <br />