Laserfiche WebLink
Page | 2 <br /> <br /> <br /> <br />Conclusions: <br />All nominated parcels have been backfilled, regraded, and have drainage control established as required <br />for Phase I bond release. DRMS will verify postmining topography with data collected during this <br />inspection. Visual evaluation indicates that nominated parcels meet Phase I requirements. No problems <br />were noted and no corrective measures were necessary. No enforcement actions were taken as a result of <br />this inspection, nor are any pending. <br /> <br /> <br /> <br />