Laserfiche WebLink
Doug Smith <br />Page 2 of 2 <br />May 31, 2019 <br /> <br />The site-wide reclamation cost estimate will be recalculated, removing tasks for structure <br />demolition and backfilling and grading of the SL-1 parcels, and including a new task for <br />maintenance of the reconstructed channel. <br /> <br />The new required surety will be thus be whichever is greater of: <br />i. The required surety prior to SL-1, minus X, or <br />ii. The updated site-wide reclamation cost estimate <br /> <br /> <br />Please revise the Areas For SL-1 Phase 1 Release map to remove a strip of land containing the <br />reconstructed Elk Creek channel, and recalculate the area of the parcels, or provide to the <br />Division a justification as to why the Elk Creek channel should fall under this SL-1, phase I <br />bond release application. <br /> <br />Yours sincerely, <br /> <br /> <br /> <br />Leigh Simmons <br />Environmental Protection Specialist