Laserfiche WebLink
oF �ato <br /> mart Ma�5 -7 <br /> »* COLORADO DIVISIC ION, MINING D SAFETY <br /> * � 1313 Sherman Street,RTR01 0203 ph(303)866-3567�� <br /> ,87 �'�ED <br /> Ps_ JUN 0 4 2019 <br /> REQUEST FOR TEC___._�h,_, ithVISION (TR) COVER SHEET <br /> OW" <br /> File No.: M- 2018-048 Site Name: Betz Borrow Pit ���MAnpW <br /> County Weld TR# (DRMS Use onlx) <br /> Permittee: SEMA Construction, Inc. <br /> Operator(If Other than Permittee): N O R <br /> oqN <br /> Permittee Representative: Cameron Mang a <br /> b <br /> Please provide a brief description of the proposed revision: <br /> Revised site access location to allow better site distance for trucks exiting site and revised mining plan <br /> to reflect beginning the excavation on south end of pit rather than north end of nit as was indicated in <br /> the approved mining plan. Revised the boundaries to reflect the available excavation and disturbance <br /> areas around the historic well site. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes y <br /> to the permit. a�� <br /> � No <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />