My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-24_ENFORCEMENT - M2011014
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2011014
>
2019-05-24_ENFORCEMENT - M2011014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 1:37:39 PM
Creation date
6/3/2019 8:58:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011014
IBM Index Class Name
Enforcement
Doc Date
5/24/2019
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Dale & Ellen Schmidt
Email Name
LJW
THM
CMM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BEFORE THE MINED LAND RECLAMATION BOARD <br />STATE OF COLORADO <br />Notice of Violation No. MV- MV- 2019-008 <br />FINDINGS OF FACT, CONCLUSIONS OF LAW, AND ORDER <br />IN THE MATTER OF A POSSIBLE VIOLATION BY DALE AND ELLEN SCHMIDT, <br />CEASE AND DESIST ORDER, CORRECTIVE ACTION, AND CIVIL PENALTIES <br />FOR FAILURE TO COMPLY WITH THE CONDITIONS OF A BOARD ORDER, File <br />No. M-2011-014 <br />THIS MATTER came before the Mined Land Reclamation Board ("Board") on <br />April 24, 2019 in Denver, Colorado to consider a possible violation by Dale and <br />Ellen Schmidt ("Operator"), cease and desist order, corrective action, and civil <br />penalties for failure to comply with the conditions of a board order, file number M- <br />2011-014. <br />The Board, being fully informed of the facts in the matter, enters the <br />following: <br />FINDINGS OF FACT <br />1. The Operator holds a 110c permit for a 2.7 -acre barrow operation in <br />Section 1, Township 34 North, Range 3 West, Pagosa Springs, Archuleta County, <br />Colorado. The site is known as the Schmidt Site. <br />2. On June 20, 2018, the Operator admitted to failing to protect areas <br />outside of the affected land from slides or damages occurring during the mining <br />and reclamation operation and failing to comply the conditions of a permit. The <br />Operator also agreed to the Division's recommendations. <br />3. In an order effective August 16, 2018, the Board found the Operator <br />to be in violation of sections 34-32.5-116(4)(i) and 34-32.5-124(1). The Board also <br />imposed several corrective actions. Relevant to this proceeding, Corrective Action <br />2 directed the Operator to submit a technical revision to the Division within sixty <br />days of the August 16, 2018 Order to update mining and reclamation plans to <br />address the reclamation of the highwalls, construction schedule for the storm <br />water control features, and provide structure agreements for the power pole and <br />lines located within the permitted area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.