Laserfiche WebLink
-4- <br /> 12. Primau future Post-minim land use check one): <br /> `] Cropland(CR) R Pastureland(PL) General Agriculture(GA) <br /> M Rangeland(RL) M Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) E Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one): <br /> ✓� Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) R Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): The top 4 inches of the top soil will be stripped and piled for <br /> reclamation using a CAT D6 dozer. The remaining 8 inches of top soil will be stripped and piled using a CAT D6 dozer and front end loader. <br /> 15. On Site Processing: 1-1 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> None <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Converting from 110 permit to a 112 permit for increased production. <br />