Laserfiche WebLink
* TR01- <br /> COLORADO DIV1 'IATION, MINING AND SAFETY <br /> 187 1313 Sherman Stre, Lj)M n1 rado 80203 ph(303)866-3567 Rece <br /> REQUEST FOR TECHNICAL REVISION TR COVER SHE T MAY 3 7 2019 <br /> ON <br /> File No.: M- C�o g 1 Y l' 015 Site Name: az!& RN�C7pi* �N�AIGQ.R engy <br /> FTy <br /> County -PYChu� TR# (DRMS Use only) <br /> Permittee: �;7 e.rnovdt �av vie �` t2e�%� 1 \�h Y-tL <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Sl:n1rP l�t� <br /> Please provide a brief description of the proposed revision: jj�&MAIV�Ihn OMkfViA& W,11 <br /> fin.o"A —r1&l cm Y rr�%,y arc la. , b u-F 611 W 0 on on`�, <br /> �e0t� �Q.t LQV"nQr (.lam % ¢ Y1 0&tV-1La& ��S aki 1MQ�tGI�.1 <br /> I Ulf) oiwk-4. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes o <br /> to the permit. G 3 <br /> o'� N <br /> O <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the b <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to v, <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> 0 <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. o <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />