My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-29_REVISION - C1981018 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-05-29_REVISION - C1981018 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:51:35 AM
Creation date
5/30/2019 10:50:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
5/29/2019
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
RN7
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
058 Backfill and Regrade B Seam Dewatering System <br />Pond 5 <br />DOZER 1 0.66 $173 <br />059 Replace Topsoil at B Seam Dewatering System #2 <br />Pond 5 <br />DOZER 1 0.12 $31 <br />060 Regrade Pond RP-1 Area DOZER 4 0.76 $792 <br />061 Regrade Pond RP-2/3 Area DOZER 4 1.96 $2,040 <br />062 Regrade Pond RP-4 Area DOZER 4 2.08 $2,162 <br />063 Regrade Pond RP-5a Area DOZER 4 1.41 $1,463 <br />064 Regrade TS#2 Sediment Pond DOZER 4 0.05 $47 <br />065 Remove Scullion Gulch Check Dams TRUCK1 1 3.75 $1,811 <br />066 Regrade B-Seam Dewatering System #1 Pond <br />Area <br />DOZER 2 8.23 $4,282 <br />067 Regrade B-Seam Dewatering System #2 DOZER 4 4.27 $4,439 <br />068 Backfill SDH-3 Dewatering Treatment System DOZER 1 1.97 $529 <br />069 Replace Topsoil to SDH-3 Dewatering Treatment <br />System <br />DOZER 1 1.50 $401 <br />070 Replace Topsoil from Stockpile to D-Portal Area SCRAPER1 3 29.30 $64,875 <br />071 Replace Topsoil from Stockpile to East and West <br />Haulroads <br />SCRAPER1 3 22.15 $49,041 <br />072 Replace Topsoil from Stockpile to RP-2/3/4 SCRAPER1 3 60.51 $133,981 <br />073 Replace Topsoil from Stockpile to RP-1 SCRAPER1 3 13.78 $30,519 <br />074 Replace Topsoil from Stockpile to RP-5a SCRAPER1 3 69.12 $153,043 <br />075 Replace Topsoil from Stockpile to Slot Storage <br />Area <br />SCRAPER1 3 1.57 $3,475 <br />076 Replace Topsoil from Stockpile to Alluvial Well <br />Area <br />SCRAPER1 3 0.45 $996 <br />077 Replace Topsoil from Stockpile to Overland <br />Conveyor Corridor <br />SCRAPER1 3 7.45 $16,490 <br />080 Load/Place Topsoil from D-Portal to East Portal <br />Vent Shaft <br />TRUCK1 1 3.98 $3,249 <br />081 Replace Topsoil on Drill Pads and Access Roads <br />MR171 <br />DOZER 1 10.16 $2,642 <br />082 Replace Topsoil from Stockpile to Access Roads DOZER 4 3.38 $3,515 <br />083 Replace Topsoil from Stockpile to Pond RP-5a DOZER 4 2.72 $2,827 <br />084 Replace Topsoil from Stockpile to Drill Pads, <br />Ponds, Ditches <br />DOZER 4 22.91 $23,830 <br />085 Replace Topsoil from Stockpile to Rock Dust <br />Facility <br />DOZER 4 0.20 $203 <br />086 Replace Topsoil from Stockpile to Pond, Road, and <br />Laydown <br />DOZER 4 0.53 $549 <br />087 Replace Topsoil from Stockpile to B-Seam Vent <br />Shaft and Road <br />SCRAPER1 3 0.62 $1,365 <br />088 Replace Topsoil from Stockpile to Light Use Road <br />to RDH-3 <br />DOZER 4 0.17 $173 <br />089 Replace Topsoil from Stockpile to B-Seam <br />Dewatering Area #1 <br />DOZER 4 0.50 $520 <br />090 Topsoil Replacement of the Upper Pond B Seam <br />#2 System <br />DOZER 1 13.46 $3,516 <br />092 Plug and Seal 14 geotechnical holes BOREHOLE 1 0.00 $1,250 <br />093 Plug and Seal RS-13L BOREHOLE 1 8.00 $987 <br />094 Seal Portals and Vent Shafts MINESEAL 1 160.00 $169,536 <br />095 Seal and Abandon MR-171 Boreholes BOREHOLE 1 10.00 $2,445 <br />096 Plug and Seal All Boreholes BOREHOLE 1 512.00 $139,065 <br />097 Demolish and Remove All Structures DEMOLISH 1 960.00 $1,876,554 <br />098 Remove B Seam Dewatering System #2 Pond 5 to <br />Pond 3 Pipe <br />DEMOLISH 1 1.00 $1,286 <br />099 Demolition of D-Seam Back-up Fan DEMOLISH 1 2.00 $776 <br />100 Drill Seeding - Large Permanent Areas REVEGE 1 342.08 $76,245 <br />102 Broadcast Seeding - Large Permanent Areas REVEGE 1 34.00 $32,438 <br />104 Drill Seeding - Small/Linear Areas REVEGE 1 122.18 $24,285
The URL can be used to link to this page
Your browser does not support the video tag.