My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-29_REVISION - C1981018 (11)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-05-29_REVISION - C1981018 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:52:15 AM
Creation date
5/30/2019 9:50:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
5/29/2019
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
RN7
Permit Index Doc Type
Findings
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> 13 <br />Stipulation No. 27: <br /> <br />UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR WILL SUBMIT <br />WITHIN 30 DAYS PLANS FOR CONSTRUCTION OF POWERLINES USING APPROVED <br />GUIDELINES FOR RAPTOR PROTECTION. <br /> <br />Status: This stipulation was satisfied and terminated on September 23, 1981. <br /> <br />Stipulation No. 28: <br /> <br />UPON APPROVAL OF DEPARTMENTAL ACTION THE OPERATOR WILL COMMIT <br />WITHIN 30 DAYS TO NOT USING PERSISTENT PESTICIDES UNLESS APPROVED BY <br />THE REGULATORY AUTHORITY AND TO FENCE ANY PONDS THAT CONTAIN <br />TOXIC MATERIALS. <br /> <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br /> <br />Stipulation No.29: <br /> <br />A STATE AIR QUALITY PERMIT IS REQUIRED BEFORE CONSTRUCTION AND <br />OPERATION CAN BEGIN. <br /> <br />Status: This stipulation was satisfied and terminated on August 27, 1981. <br /> <br />Stipulation No. 30: <br /> <br />WITHIN 30 DAYS OF ACCEPTANCE OF APPROVAL OF THE MINE PLAN, THE <br />APPLICANT SHALL ENSURE THAT THEIR CULTURAL RESOURCE CONTRACTOR <br />HAS SUFFICIENTLY DOCUMENTED THE 17 "POTENTIALLY" ELIGIBLE SITES SO <br />THAT OSM MAY SUBMIT A REQUEST FOR ELIGIBILITY OR NON-ELIGIBILITY <br />CONCURRENCE FOR THESE SITES TO THE COLORADO SHPO. THE INITIAL <br />DOCUMENTATION ON THE ELIGIBILITY TEST PROGRAM MAY BE IN DRAFT FORM <br />AND CONCERN ITSELF ONLY WITH THE QUESTION OF ELIGIBILITY. A BRIEF <br />FINAL REPORT ON THE TESTING PROGRAM SHOULD BE SUBMITTED WITHIN 90 <br />DAYS. <br /> <br />Status: This stipulation was satisfied and terminated on September 23, 1981. <br /> <br />Stipulation No. 31: <br /> <br />FOLLOWING SHPO REVIEW AND CONCURRENCE WITH THE ELIGIBILITY <br />ASSESSMENTS, OSM WILL PROVIDE WESTERN FUELS WITH A LIST OF SITES THAT <br />HAVE BEEN DETERMINED ELIGIBLE. WITHIN 60 DAYS OF RECEIPT OF THIS <br />ELIGIBILITY LIST WESTERN FUELS WILL SUBMIT A SITE-SPECIFIC MITIGATION <br />PLAN FOR THOSE ELIGIBLE SITES FOR REGULATORY APPROVAL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.