Laserfiche WebLink
<br /> <br /> <br /> <br /> 8 <br />Stipulation No. 7: <br /> <br />THE APPLICANT MUST ALSO COMMIT TO PROVIDING A MITIGATION PLAN <br />SHOULD THE EFFECTS OF DRAWDOWN IN THE WHITE RIVER ALLUVIAL AQUIFER <br />DETRIMENTALLY AFFECT ESTABLISHED AGRICULTURAL ACTIVITIES, EITHER <br />THROUGH UNFORESEEN IMPACTS OR FROM GROUNDWATER DEPLETIONS WHICH <br />ARE LARGER THAN EXPECTED. <br /> <br />Status: This stipulation was satisfied and terminated on May 9, 1986. <br /> <br />Stipulation No. 8: <br /> <br />PRIOR TO THE DEVELOPMENT OF MAINS AND SUB-MAINS BENEATH THE <br />ALLUVIAL BODY OF RED WASH, THE APPLICANT MUST SUBMIT THE <br />INFORMATION REQUIRED BY SECTION 2.06.8(4) OF THE COLORADO REGULATORY <br />PROGRAM, ALONG WITH THE PLAN TO ENSURE THAT THE PERFORMANCE <br />STANDARDS AND MONITORING REQUIREMENTS OF SECTION 4.24 ARE MET. THIS <br />PLAN MUST ADDRESS THE ANALYSIS OF SUBSIDENCE MONITORING DATA UNTIL <br />THE SUBMITTALS ARE APPROVED BY THE REGULATORY AUTHORITY. <br /> <br />Status: This stipulation was satisfied and terminated on May 9, 1986. <br /> <br />Stipulation No. 9: <br /> <br />THE APPLICANT MUST ALSO SUBMIT, AS PART OF THE PERMIT APPLICATION, <br />WRITTEN DOCUMENTATION AS TO THE NATURE OF THE REGIONAL IRRIGATION <br />INVENTORY PERFORMED. THIS DOCUMENTATION MUST ADDRESS THE <br />DEFICIENCIES OUTLINED IN SECTION C, SO THAT THE AVF DETERMINATION FOR <br />SCULLION GULCH CAN BE ADEQUATELY SUBSTANTIATED. THE INFORMATION <br />SHOULD BE SUBMITTED WITHIN 30 DAYS OF THE GRANTING OF THE PERMIT. <br /> <br />Status: This stipulation was satisfied and terminated on August 10, 1981. <br /> <br />Stipulation No. 10: <br /> <br />THE APPLICANT SHALL PROVIDE THE REGULATORY AUTHORITY WITH A <br />CORRECTED VERSION OF MAP 77, REFUSE DISPOSAL AREA SITE PREPARATION, <br />WHICH SHOWS THE LOCATION OF THE CULVERT THAT CARRIES FLOW FROM <br />THE NON-TOXIC FILL STOCKPILE DITCH ACROSS THE HAUL ROAD INTO THE <br />SUBAREA R2-3 SEDIMENT POND. THIS INFORMATION SHOULD BE SUBMITTED <br />WITHIN 90 DAYSOF APPROVAL OF THE MINE PLAN PERMIT. <br /> <br />Status: This stipulation was satisfied and terminated on October 27, 1981. <br /> <br />Stipulation No. 11: <br />WITHIN 60 DAYS OF APPROVAL OF THE MINING PERMIT, THE APPLICANT SHALL