My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-29_REVISION - M1998014 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998014
>
2019-05-29_REVISION - M1998014 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:02:27 PM
Creation date
5/29/2019 2:00:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998014
IBM Index Class Name
REVISION
Doc Date
5/29/2019
Doc Name
Request for Technical Revision
From
Oldcastle SW Group
To
DRMS
Type & Sequence
TR1
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Greg Lewicki And Associates, PLLC <br /> 3375 W. Powers Circle Phone: (720)842-5321 Fax(303)346-6934 <br /> Littleton, CO 80123 E-mail: info(a'lewicki.biz <br /> May 28, 2019 <br /> Stephanie Mitchell <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> 303-866-3567 <br /> RE: Gypsum Ranch Pit, M-1998-014, Technical Revision <br /> Mining of Phase 7 <br /> Ms. Mitchell <br /> Please see the attached Parks and Wildlife correspondence, technical revision for the Gypsum <br /> Ranch Pit, 11151 US Hwy 6, Gypsum, CO 81637, and associated maps. Following the approved <br /> new Eagle County Special Use permit modification acceptance and Parks and Wildlife <br /> assurances, adjustments to the DRMS permit#M-1998-014 are necessary. <br /> Changes discussed in this technical revision include: Phase 7 mining—a minor expansion of <br /> mining and reclamation activities to remove the final berm along the north and west sides of the <br /> site. <br /> Attachments included: <br /> DRMS TR Application Form <br /> Map C-2 Mine Plan <br /> Map C-3 Mine Plan cross-sections <br /> Map F-1 Reclamation Plan <br /> CPW Old Castle Support Letter <br /> Phase 7 Mining <br /> Phase 7 mining includes the removal, processing, and distribution of gravels mined from the <br /> final berm along the north and west sides of the site. This expansion reflects the desire of the <br /> landowner to change the final condition of the property. Maps C-2 and F-1 show the addition of <br /> Phase 7 mining where mining will daylight out over the valley floor. However, during active <br /> mining, a short stormwater berm, approximately 2-6 feet high, will be maintained to facilitate <br /> proper stormwater drainage into the site and eliminate overflow into the Eagle River. Map C-3 <br /> cross-sections show the change in berm height across the pit along Phase 7 mining. <br />
The URL can be used to link to this page
Your browser does not support the video tag.