Laserfiche WebLink
op cow <br /> COLORADO DI\ ATION, MINING AND SAFETY <br /> * l876 1313 Sherman& do 80203 ph(303)866-3567 <br /> * * {` <br /> LJ1Mthma*% <br /> po <br /> r' <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET wilt <br /> v � <br /> File No.: M- 83-148-CN-1 site Name: Neal Pit MAY 2 92019 <br /> an V141ON OF P <br /> County Montrose TR# (DBMS Us� �,a� r1aH <br /> Permittee: <br /> Montrose County Road and Bridge �� ,� <br /> Operator(If Other than Permittee): S a m e (� 3 <br /> Norm David/Keith Laube <br /> Permittee Representative: a <br /> �• w <br /> Please provide a brief description of the proposed revision: o <br /> y <br /> Montrose County is in the process of installing a clay cut off wall on the west side of mining area that was previously mined out.This clay <br /> cut off wall is to minimize ground water entering into the pit area when the neighbor irrigates his pasture.We have installed French drains <br /> West and he has recommended doing a Technical Revision for this process.We hope that this will work and be within our Mining Plan. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. s I­1 <br /> o <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the 13 <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, I I2d(1, 2 or 3) $1006 ❑ <br />