Laserfiche WebLink
Revised Bond Estimate <br /> Revised Bond Estimate Based-on outside contractor proposal in 2017. <br /> 1. General Cotions— $80,000.00 <br /> Mobilization and Demobilization, Supervision Overhead <br /> 2. Dewatering - $17,250.00 <br /> Labor and pipe. <br /> 3. Pumps and electricity supplied by owner $30,000.00 <br /> 4. Cut and Fill 273,000 CY @ $1.9WCY $491,400.00 <br /> Total $618,650.00 <br />