Laserfiche WebLink
Reclamation Plan <br /> All mining an the property is complete. An estimated 15.3 acres of lake surface remains. All <br /> wateer surface on the property will be eliminated by backfilling the excavation to 2' above the <br /> water table. Heavy equipment including dozers, excavators,wheel Ioaders, scrapers and haul <br /> trucks may be used to move overburden material from the property bordering the lakes into the <br /> lake areas. To facilitate the placement of the material the lakes will be dewatered with high head <br /> high volume pumps running 24/7hrs during the backfilling process. All water pumped from the <br /> lakes will stay within the property boundary either into pond C from D or from pond C in to the <br /> East Lake Gravel Pit. All the disturbed areas will be planted with an approved,ground cover seed <br /> mixture with the exception of access rmads. <br /> Reclamation Timetable <br /> Backfilling of the lakes will begin in the winter of 2019 when the Arkansas River fall runoff is <br /> over and the water table would be at its lowest point. Estimated three months for completion. <br />