My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-09_PERMIT FILE - C1981019A (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-04-09_PERMIT FILE - C1981019A (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 2:30:36 PM
Creation date
5/29/2019 10:45:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/9/2019
Doc Name
South Taylor Erosion Control And Sedimentation Plan
Section_Exhibit Name
Exhibit 07 Item 20 -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> Section Page <br /> IntroductoryText............................................................................................................Exh. 7-20-1 <br /> Table 4, Summary of Sediment Ponds ...........................................................................Exh. 7-20-2 <br /> Table 4, Summary of Sediment Ponds (Historic)...........................................................Exh. 7-20-7 <br /> Part A, Section 28 Pond <br /> Summary Text, Section 28 Pond Drainage..................................................................Exh. 7-20A-I <br /> Figure IA-3, Section 28 Pond Design Drawing..........................................................Exh. 7-20A-4 <br /> Figure lA-4, Section 28 Pond Drainage......................................................................Exh. 7-20A-5 <br /> Figure lA-5, Section 28 Pond Subwatersheds ............................................................Exh. 7-20A-6 <br /> SEDCAD Model, Section 28 Pond, 10 Year, 24 Hour Event.....................................Exh. 7-20A-7 <br /> Part C, West Taylor Pond <br /> Summary Text, West Taylor Pond Drainage...............................................................Exh. 7-20C-1 <br /> Figure 1 C-3, West Taylor Pond Design Drawing .....................................................Exh. 7-20C-3 <br /> Figure 1 C-3A, West Taylor Pond As-built ................................................................Exh. 7-20C-4 <br /> Figure I C-4, West Taylor Pond Drainage, Active Mining Case <br /> Figure 1 C-5, West Taylor Pond Design, Post Mining Case <br /> SEDCAD Model, West Taylor Pond, 10 Year, 24 Hour, Active Mining Case <br /> SEDCAD Model, West Taylor Pond, 25 Year, 24 Hour, Active Mining Case <br /> SEDCAD Model, West Taylor Pond, 10 Year, 24 Hour, Post Mining Case <br /> SEDCAD Model, West Taylor Pond, 25 Year, 24 Hour, Post Mining Case <br /> Part D, Temporary Channel Design <br /> Temporary Channel, 10 Year, 24 Hour Event.............................................................Exh. 7-20D-1 <br /> Part E, Permanent Channel Design <br /> Permanent Channels, 100 Year, 24 Hour Event..........................................................Exh. 7-20E-1 <br /> Part F, Geotechnical Investigations, South Taylor Sediment Ponds <br /> Geotechnical Report .................................................................................................... Exh. 7-20F-1 <br /> Part G, Terrace Ditches on Permanent Fill Areas, South Taylor <br /> Terrace Ditch Design...................................................................................................Exh. 7-20G-1 <br /> Exh. 7-20-ii Revision Date: 1/28/19 <br /> Revision No.: TR-131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.