2019-05-24_PERMIT FILE - M2019027 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019027
>
2019-05-24_PERMIT FILE - M2019027 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 6:38:51 AM
Creation date
5/28/2019 9:34:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019027
IBM Index Class Name
PERMIT FILE
Doc Date
5/24/2019
Doc Name
Application
From
Colorado Sand Company
To
DRMS
Email Name
PSH
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-9 <br /> In either situation, surplus capacity within the fines recovery pit would be first utilized to accommodate the <br /> additional process slurry tonnage; or, if additional fines disposal capacity is determined necessary, such <br /> would be accomplished within a portion of the main pit(via Technical Revision). <br /> 4) Phase 5: Site Reclamation: On completion of mining and processing activities, all plant facilities and <br /> supporting infrastructure will be removed from the site. Site reclamation will be carried out in a manner <br /> consistent with that presented in Exhibit D: Reclamation Plan. <br /> Given the foregoing general discussion as to the overall scope of the Keenesburg Project, specific project <br /> components are discussed, in sequence, as per the requirements of Rule 6.3.3 (a)through(f). <br /> (a) ESTIMATED DATE MINING WILL COMMENCE AND END <br /> It is anticipated that"mining"(defined as the initiation of pre-stripping excavation activities)will commence during <br /> the 3,d Quarter (Q3) of calendar year 2019, subject to procurement of all necessary permits, approvals, and <br /> authorizations. <br /> The actual mining of sand materials (and processing operations) will commence immediately thereafter, and <br /> continue for an estimated 3 to 6 month duration (with 3 months of"effective production time", defined as dryer <br /> operational time). The duration of actual mining(and processing)activity is constrained by the estimated available <br /> resource, and potentially subject to unforeseeable process interruptions and/or weather-induced delays,etc. <br /> Site closure and reclamation will commence following completion of all mining and processing operations. At this <br /> juncture, it is anticipated that site closure and reclamation can be accomplished by end of 2nd Quarter (Q2) of <br /> calendar year 2020. Site closure and reclamation activities are further described in Exhibit D: Reclamation Plan, <br /> and depicted in Exhibit E-2: Reclamation Plan Map. <br /> Keenesburg Project—Limited Impact 110 Application_May 24,2019 <br />