Laserfiche WebLink
RIGID VENTILATION DUCT <br /> (36" FIBERGLASS) <br /> ELECTRIC CABLE (4160V) <br /> COMPRESSED AIR LINE <br /> (4" HDPE) //\I\�// n //NI <br /> LEAKY FEEDER CABLE <br /> WATER SUPPLY LINE �� FEMCO PHONE CABLE <br /> (3" HDPE) �� \— \���// <br /> i-konT" BLAST LINE %I <br /> TUNNEL SPRING-LINE <br /> Al" - - - - R6.0FT - - - - - - \II <br /> VARIES I; CL <br /> TUNNEL EXCAVATION <br /> NEAT-LINE %n <br /> 8.0 FT <br /> A\'\TYPICAL TUNNEL 12.0 FT <br /> AS-BUILT LINE �A' <br /> G11= Win= <br /> VARIES <br /> TUNNEL LOW POINT <br /> DRAINAGE <br /> O�;,`ND 0 UeF/L <br /> VO�.•'� JON^;-*, <br /> TYPICAL TUNNEL CROSS-SECTION GEOMETRY <br /> NOT TO SCALE :Z 648 <: <br /> -O� <br /> SS/0NA1.E <br /> DESIGNED VARIOUS REVISION <br /> WARNING DRA"N RLM CLIMAX MINE 0 <br /> 0 0.5 <br /> ® GHEGKED PROJECTNO. <br /> I <br /> ISSUED FOR CONSTRUCTION RLM M AJH MAYFLOWER FLOOD BYPASS TUNNEL SYSTEM 12235 <br /> 19 Climax Molybdenum �' 'm DLISSUED FOR BID RLM 10/18 IF THIS BAR DOES <br /> AFiupod-MebftawWW 4& NOT MEASURE I' CLIENT MbVRV PHASEITUNNEL MFT-C-05 <br /> p ISSUED FOR CLIENT REVIEW RLM 9I78 PROJECT&CONSTRUCTION MANAGEMENT THENDRAWING IS TYPICAL CROSS-SECTION SHEET 1 OF 1 <br /> , , TE <br /> REV DESORIPTONOFREVISION By ENGINEERING GEOLOGY SURVEYING NOT TO SCALE IM DATE as/1s <br />