Laserfiche WebLink
EXAMPLE OF GABIONS IN <br /> EXAMPLE OF GABIONS IN DISREPAIR.RESHAPE AND <br /> ADEQUATE CONDITIONS REINFORCE STEEL BASKET. <br /> (NO REPAIR NEEDED) <br /> _ B <br /> 411 <br /> DRAINAGE INLET LOCATIONS <br /> 60"X 24"CHDPE IM <br /> REDUCING TEE NUMBER STATION <br /> 1 163+48 <br /> — � 2 168+19 <br /> d IIIIIII II III— IIIIIIIIIII \ <br /> I III II III III IIIIII1111 I 3 178+97 <br /> II II II II II II III IIIITI'nT R�IIII IIIIIIIIII I <br /> 4 184+14 <br /> I�I I�Fii FIB I ICI4HII I-H N H 11 I l y1 5 190+62 <br /> / IIIIIIIIII II II II III II III111 III II II II III \ <br /> I IIIIIIIIII II II II III 11IIIIII III II II II II II 1 <br /> 1 llllllllll II II II III II II If II III II II II II II X <br /> \ {IIIIIIIIII II III1111 II II II II III II II II II II/ <br /> 411 <br /> v <br /> E GABION WALL REPAIR DRAINAGE INNL <br /> ET <br /> 0 2 4 6 0 <br /> Scale in Feet <br /> NOTES: <br /> 1. REPAIR OR REPLACE GABION BASKETS <br /> AS DIRECTED BY ENGINEER. <br /> 2. GABION SECTIONS HAVE 1 TO 4 LEVELS. <br /> m <br /> E_ <br /> V <br /> LL CONCRETE INLET MARKER POST <br /> w STRUCTURE FORM SWALE <br /> X (REF DWG.412) (FIELD LOCATE) TO DIRECT FLOW APPROX.ORIGINAL <br /> TO INLET FINAL GROUND SURFACE, GROUND <br /> N MIN.3'-6"OVER PIPE _ SURFACE <br /> E <br /> GROUND <br /> TX T GABION BASKET, SURFACE <br /> i <br /> FILL W/3"TO 10"COBBLES \ 11 - <br /> - \ <br /> i <br /> III— 60"X 24"CHDPE <br /> \\ _ REDUCING TEE <br /> o O O�OI� 1'MIN. <br /> EMBED GABION BASKET 24"CHDPE, <br /> INTO GROUND (FIELD FIT) <br /> 9 MIRIFI 180 N l—I I D O �O A MIN.OF 12". <br /> LL GEOTEXTILE oO <br /> =11 0�00�po III I=I I F <br /> 60"X 24"REDUCING <br /> = -III III —I I—Ill—III= 60"DIA. CHDPE TEE, ANGLE AT 45" <br /> CHDPE PIPE DRAINAGE INLET <br /> 411 <br /> DRAINAGE INLET <br /> SECTION <br /> SECTION 411 <br /> GABION WALL COMPLETE REPLACEMENT D 2 Scale nFeet 6 6 0 2 4 6 6 <br /> O L Scale in Feet <br /> TYPICAL SECTION <br /> 3 0 1 2 4 6 <br /> N Scale in Feet <br /> t7 <br /> z <br /> 9 <br /> CR <br /> NO. DATE MADE BY CKD.BY REMARKS DRAWING NO. REFERENCE <br /> •This droWing together With any and all additions, Climax Molybdenum Climax Mine <br /> o N p 05/18 TEM SMM ISSUED FOR BID corrections, changes and alterations thereof is the 3 Climax Molybdenom INTERCEPTOR REHABILITATION PROJECT climax,co <br /> ,n Z Q 03/19 DCM SMM ISSUED FOR CONSTRUCTION property at Climax Molybdenum Company and is p <br /> p furnished on the express condition that It shall w A Freeport-McMoRan Company �"F <br /> N to not be reproduced, copied /ent, or disposed of i p A y WEST INTERCEPTOR CULVERT REPLACEMENT(PHASE D) DCM 911/16 As Noted <br /> o > 0 directly or indirectly, nor used for any other w <br /> 6 W purpose p y 370❑s.IracA 51•aeeT DRAINAGE INLETS AND GABIONS s`MM 12/1/16 DRAWING NO. <br /> ur osa than for Which if is s ecircol/ furnished <br /> w W.W.WHEELER Ena�EWOoo,CO aol 1 o-34os <br /> 0 0 Without the prior Writfen consent of said Cllrnax ILL a ASSOCIATES, INC 303-761-413❑ �ccl=Frtoav 3-520-00411 <br /> Mdybdenum Campony," <br /> r ",a„",<.,e",;",,,, FAX 303-761-2802 TYPICAL PLANS,SECTIONS,AND DETAILS <br />