Laserfiche WebLink
EXHIBIT S <br /> Permanent Man-Made Structures within 200 Ft of the Affected Land <br /> 1. Power Lines/Poles <br /> 2. Phone Lines/Poles <br /> 3. Oil and Gas Lines <br /> 4. Fences/Structures <br /> 5. Improved Roads <br /> 6. Irrigation Channels/Ditches/Pipelines <br /> J-2 Contracting Company believes that the mining operation, as proposed, will not adversely <br /> affect any of the permanent, man-made structures located within 200 ft of the affected area. <br /> However, the applicant still anticipates providing evidence of agreements for compensation with <br /> the appropriate structure owners or an engineering evaluation (see attached slope stability <br /> report) that adequately demonstrates that the proposed mining and reclamation operations will <br /> not result in damage to the structures. <br /> There are oil/gas wells and processing equipment located on the site or within 200 feet of the <br /> mining limits. J-2 Contracting Company is actively in negotiations with Noble Energy and <br /> Extraction Energy to develop a surface use agreement as required to address access, oil/gas <br /> exploration, or oil/gas extraction activities as those two companies are the only oil/gas lessees <br /> that will be affected by the mining. <br /> 4• J&T Consulting,Inc. J-2 Contracting Company <br /> u' DPG Pit <br /> DRMS 112 Permit Application <br />