Laserfiche WebLink
-4- <br /> 12. Primary future Post-minim land use check one): <br /> Cropland(CR) D Pastureland(PL) Fi General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) _J Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Dozer and front end loaders remove material and load to conveyor for hauling to processing plant. <br /> 15. On Site Processing: V Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Material is processed into specification aggregates using crushers, and screen plants <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This amendment adds 2.09 acres to the permit area. The mining methods do not change. The . <br /> reclamation methods do not change and the primary access remains as currently approved. <br /> This amendment increases the reserves of gravel in the mine and the life of the mine and cleans <br /> up the north line of the proposed reservoir. <br />