Laserfiche WebLink
May 14, 2019 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 7 <br /> <br />Fish Creek Borehole Y N <br />Pumps <br />are off <br />mine water (flock <br />added) <br />Fish creek 3 cell pond , discharge at site 115 <br />triggers sampling at Fish creek <br />downstream. Iron staining on rocks <br />in outfall. <br />18LT vent shaft <br />ponds <br />Y N <br />Pond F Y Y runoff from <br />facilities <br />Foidel WET test location <br />Pond G Y Y Surface Runoff <br />from laydown <br />Area <br />Foidel <br /> <br />Pond E Y Y Delta forming @inlet (operator <br />stated they are working on getting a <br />long reach shovel to clear) <br />Area No. 1 Pond <br />(Pit Pond) <br />Y N mine, sumps, <br />diversion ditch <br /> <br /> Water goes to wash plant or <br />recycled underground <br />Waste pile under <br />drain <br /> Y Pond D <br />Pond D Y Y WET test location <br />Pond B Y Y Bob pile Foidel Erosional feature above inlet needs <br />to be stabilized, cattail cleared from <br />weir <br />Pond C Y N <br /> <br />Pond T Y N laydown area Foidel v-notch weir, culvert under railway <br />Water Treatment <br />ponds <br />Y Y (to <br />leach <br />field) <br />facilities water leach <br />field <br /> <br />Stream buffer zone <br />@ train load-out <br /> ok <br /> <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br />The operator noted that they are planning to replace some culverts at Pond D and remove the old wash plant. The <br />Waste pile is currently on the 3rd lift, which will likely be completed and seeded this summer. Thickener lines