Laserfiche WebLink
11)(Optional) Please provide additional information about the Reclamation Plan: <br /> All Feelamatien will be eempleted annually.All exeavation and disturbed areas will be backfilled and <br /> Into the excgvation. We carefully match the surroundingntours rMrrIng to ph—otos takene <br /> any disturbance took place.The material is compacted y use ot the back hoe driving over it w is wi <br /> prevent any settling. Stockpiled topsoil will then be distributed over the disturbed areas.Surface <br /> water diversion structures will be constructed of downed woody debris, logs, rocks, etc.at all sites to <br /> help prevent erosion. A forest approved seed mixture is cast and then raked in at the rate of 1 <br /> pis./acre.,forming furrows as to helpprevent washout of the seed,All minerals and wage rock are non <br /> reactive No secondaq�or harmful S-j-'hQt2nCeS cuchm 2c*ds, oxides, etc are produced through <br /> wea};eFing—^,ll gaFbage-sod-sel+d-waste-is Femeved-fFom the <br /> All reclaimed areas a,e visited multipe times dut Ong the year to monito; vegetation 15,Cwth. <br /> Reseeding, should it be needed will be peftrmed the following spring. Noxious weeds are monitored <br /> and removed if present. <br /> This is a contemporaneous cut and filloperation. Backfilling will take place before moving on to any <br /> other excavation site. <br />