My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-22_PERMIT FILE - M2019026
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019026
>
2019-05-22_PERMIT FILE - M2019026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:03:37 PM
Creation date
5/22/2019 2:31:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019026
IBM Index Class Name
PERMIT FILE
Doc Date
5/22/2019
Doc Name
Application
From
Michael Royer
To
DRMS
Email Name
ERR
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17)(Optional) Please provide additional information about the Mine Plan: <br /> The mine will consist of two areas,Site#1 and Site#2. Each site is 200ft AWL Within these sites <br /> zones and Site#2 has 6 target zones. i zones y excavating i <br /> than 30ft x4Oft x10 ft deep. We will be using a John Deere 310 Rubber tired 4 wheel drive back hoe or <br /> similar. <br /> Procedure- First all top soil is scraped and collected from the excavation site.This topsoil is piled <br /> separately from all other materials for later distribution.Based on an average of 4inch depth we would <br /> anticipate a 22 yards of topsoil for each 30ft x4Oft excavation_ <br /> Consiliering the max* tion of 30ft x40 We WOUld expect a total volume of backfill at 44444 <br /> cu.yds.We will be pel`fffrning"centempWaneOUS Feelamation" filling any open eUtS befGFe Fn- i — <br /> an to any other new excavation area.Any stockpiled matei ial will be bernied to prevent any downhill <br /> movement of rocks.Any open excavations will be fenced to protect the public and wildlife.GFdde5 in <br /> excess o will utilize silt fences. we anticipate excavation of 4-6 suff x 40 ft areas on site TL in <br /> 2019. Each excavationshould take 3-5 days including the contemporaneous reclamation. Each <br /> 30ftx40 max area(plus any disturbance)will be reclaimed immediately after backfilling. <br /> We anticipate excavating 4-6 areas on site#2 during the 2020 season.The 2021 season would be <br /> used for mining any areas not performed the previous year, Only 1 site will be worked at a time <br /> Mnr+11 be ene-o(ae ater and 2 helpers. <br /> Total distu,bance Calculation. <br /> i e 300-001 excavation = sq. stockpile rea= 14,400 sq ft. <br /> Site#2 6 possible x excavation= 7200 sq. .+7200 sq. .stockpile area= 14,400 sq. . <br /> Total Disturbance 28,800 sq.ft. or.66 acres <br /> To minimize this disturbance we will utilize stockpiling on future cut areas and already backfilled areas <br /> within the 30x4O area.See Diagram IV R. "Backfill Illustration" <br />
The URL can be used to link to this page
Your browser does not support the video tag.