My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-22_PERMIT FILE - M2019026
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019026
>
2019-05-22_PERMIT FILE - M2019026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:03:37 PM
Creation date
5/22/2019 2:31:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019026
IBM Index Class Name
PERMIT FILE
Doc Date
5/22/2019
Doc Name
Application
From
Michael Royer
To
DRMS
Email Name
ERR
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: 7/14/19 and completion: 10/15/21 <br /> 2) How many years is the mine anticipated to be operational: 3 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits(check one): <br /> (E])all-yearlong or(_O)seasonally,explain: 2-3 week period in July/August weather permitting <br /> 4) How many aces of the mine site will be disturbed at any given time: .06 acres <br /> 5) Depth of topsoil to be salvaged(only for surface disturbances) (check one): <br /> =4-6 inches 6-8 inches <br /> 8-10 inches -H-10-12 inches <br /> Other: 0-3in site 1, 3-6in.site 2 <br /> N/A, explain: <br /> 6) Will you need to move any overburden (check one): (-[:I)Yes or( (�No <br /> a. If yes,approximately how thick is the overburden? feet <br /> 7) How will the mine be accessed: ( ✓n)existing roads(J:J)new roads will be created <br /> Please describe the existing roads: <br /> Access is from established noA syste roads, Old forest sentice road 215 2nd 21 FIA Thprp_ ra2ds a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> No new roads needed_ <br /> 8) Will water be needed during the mining operation (check one): (-[:])Yes or(LEI)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): CO)Yes or M No <br /> a. If yes,please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process(check one): (_[JJ Yes or(JZ)No <br /> a. If yes,please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.