Laserfiche WebLink
Table 2-Monthly Piezometer Elevations <br /> Monitoring Well Date Piezometer Depth Depth to Water Depth of Water <br /> Identification Observation B B ft <br /> P6 04/30/2019 72.46 DRY N/A <br /> P7 04/30/2019 92.50 92.29 0.21 <br /> P8 04/30/2019 97.51 96.67 0.84 <br /> P9 04/30/2019 72.30 71.90 0.40 <br /> P10 04/30/2019 58.30 57.58 0.72 <br /> I'll 04/30/2019 41.80 41.39 0.41 <br /> P12 04/30/2019 41.71 41.67 0.04 <br /> P13 04/30/2019 41.34 41.03 0.31 <br /> P14 04/30/2019 41.24 DRY N/A <br /> P15 04/30/2019 41.10 40.86 0.24 <br /> The leak detection system at the TSF Collection Pond was inspected April 30,2019. A total of 860 gallons <br /> (26.9 GPD)were evacuated from the leak detection system and pumped to the LTF. The LTF underdrain <br /> system flow was measured to be approximately 31.5 gallons per minute(gpm). <br /> West Pit Waste Water Treatment Plant <br /> During the month of April 2019, the West Pit Water Treatment Plant was operated under Colorado <br /> Department of Public Health and Environment(CDPHE)CDPS Permit No. C00045675 for discharge into <br /> the Rito Seco alluvial aquifer. During the month of April, 8,112,900 gallons (24.90 acre-feet) of treated <br /> water was discharged to the Rito Seco and 464,400 gallons (1.43 acre-feet) of water transferred from the <br /> West Pit to the LTF. There was no sludge transferred from the water treatment plant drying pad to the LTF. <br /> BMRl performed the monthly visual seepage expression inspections on April 30, 2019 in the historic <br /> seepage area identified in Figure 2 of the permit. No seepage expressions were observed in the historic <br /> seepage area during April 2019. <br /> BMRI measured the monthly West Pit backfill, alluvial and monitoring wells as required under in the <br /> QA/QC Plan. Measurements obtained for the monthly wells are shown in Table 3. <br /> Table 3-Monthly and Quarterly Groundwater Depth to Water <br /> Monitoring Well Identification Observation Date Depth to Water <br /> ft <br /> BF4 04/30/2019 24.83 <br /> BF-5R 04/30/2019 30.75 <br /> BF-6 04/30/2019 30.84 <br /> M-6 04/30/2019 DRY <br /> M-7 04/30/2019 DRY <br /> M-8 04/30/2019 DRY <br /> M-9 04/30/2019 141.33 <br /> M-10 04/30/2019 25.13 <br /> M-11 R 04/30/2019 39.52 <br /> M-12 04/30/2019 174.73 <br /> M-13R 04/30/2019 125.73 <br /> M-14 04/30/2019 130.88 <br /> M-15 04/30/2019 90.36 <br /> M-16 04/30/2019 22.50 <br /> M-17 04/30/2019 29.34 <br /> M-18 04/30/2019 25.59 <br /> M-19 04/30/2019 22.95 <br />