My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-21_INSPECTION - C1981019 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2019-05-21_INSPECTION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 10:17:17 AM
Creation date
5/22/2019 9:54:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
5/21/2019
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company LP
Inspection Date
5/14/2019
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 14, 2019 C-1981-019/Colowyo Coal Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 6 of 9 <br /> <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br />The Collom Pit, facilities and associated disturbances have been approved with a cumulative bond and schedule <br />based upon Exhibit 13C. The Collom area approved disturbance limit was inspected to ensure Colowyo was <br />within its approved boundary. The boundaries were driven and walked to and compared to GPS. Colowyo has <br />preemptively created approximately a 50 foot buffer within its max disturbance boundary to ensure all <br />disturbances is within the approved limits. No issues were observed. <br /> <br />Coal was being stockpiled at the Collom facility stockpile location. Coal has not yet been transported from Collom <br />to the loadout at the time of this inspection. <br /> <br />Southern disturbance limit at Collom Pit. Collom coal stockpile. <br /> <br />OTHER (SPECIFY): <br />Activities within the South Taylor Pit was temporarily halted in preparation for a cast blast. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3), Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5) and <br />(6)/4.03.2(5) and (6), Reclamation 4.03.1(7)/4.03.2(7): <br />The Collom Haul Road was being paved and the final intersection with the loadout was being worked on. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The East and West Pit reclamation looks good. Due to a wet winter and spring, vegetation has begun to reestablish <br />itself.
The URL can be used to link to this page
Your browser does not support the video tag.