My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-17_REVISION - M1994117
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994117
>
2019-05-17_REVISION - M1994117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 5:46:07 AM
Creation date
5/20/2019 1:02:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
REVISION
Doc Date
5/17/2019
Doc Name
Adequacy Review #3
From
Colorado Milling Company
To
DRMS
Type & Sequence
AM1
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f.The length and diameter of the culvert installed in the Times Mine adit is 50 feet in length by 5 <br /> feet in diameter. <br /> g.The dimensions of the concrete bulkhead in the Times Mine adit are approximately 6 feet in <br /> height by 4.5 feet in width by 3 feet in thickness. <br /> h.The distance to the bulkhead from the portal entrance is 108.14 feet. <br /> i.The distance between the bulkhead and the winze opening is 356.00 feet. <br /> j.There will not be any equipment installed in the Times Mine adit and/or Wynona Mine shaft. <br /> 3)The operator's response to item no. 9 states that water will be drawn from the Times and Wynona <br /> Mine workings from drill holes and pumps that will be connected to these mine workings. It was <br /> the Division's understanding that water would only be pumped out for mill use from the Wynona <br /> Mine shaft. Please describe any other locations proposed for obtaining water from these workings. <br /> Additionally, please be sure these locations are clearly identified on the E-5 - Mill Site map. <br /> CMC Response: CMC will pump water from both the Times Mine and the Wynona Mine <br /> workings from existing drill holes and pumps that will be installed in these mines. Both of these <br /> drill holes are clearly identified on Map E-5-Millsite Map. <br /> 4)The operator's response to item no. 10 states the operation will access the water pipeline <br /> easement using four historic mine roads. Please describe these existing roads. Will the roads <br /> need to be improved and/or widened for use by the operation? Will any vegetation need to be <br /> removed from these areas? This information is needed for the Division to determine whether the <br /> access roads are considered affected land pursuant to Rule 1.1(4). Please show these historic <br /> mine roads on the E-1 through E-5 maps. <br /> CMC Response: The Gold Hill Mill Waterline will be accessed using four historic mine roads. <br /> The main historic mine access road to the Gold Hill Mill Pipeline Easement is located off of <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.