My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-17_REVISION - M1994117
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994117
>
2019-05-17_REVISION - M1994117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 5:46:07 AM
Creation date
5/20/2019 1:02:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
REVISION
Doc Date
5/17/2019
Doc Name
Adequacy Review #3
From
Colorado Milling Company
To
DRMS
Type & Sequence
AM1
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Accompanying this page is EXHIBIT E—MAPS showing Revised E-1 Mine Plan Map to depict <br /> all of the permanent man-made structures near Left Hand Creek and the proposed foot path on the <br /> Gold Gulch No.3 unpatented mining claim; a Revised E-2 Surface Ownership and Permit Area <br /> Map showing historic access roads; a Revised E-3 Mine Reclamation Plan Map showing the <br /> historic mine access roads and the Times Mine, the Wynona Mine and the Gold Hill Mill Pond; a <br /> Revised E-4 Surface Ownership and Permit Area Map; a new Map E-5 of the Gold Hill Millsite <br /> and the Times Mine Portal; a new Map E-6 showing the Access and Waterline Easements as well <br /> as a Floodplain Map of the area where the Pump Station will be located above the five-hundred <br /> year floodplain. Map E-1 now shows the location of the Power Line and the Power Poles and the <br /> location of the FEMA Flood Plain in relation to the permanent man-made structures in this <br /> location,as well as the proposed foot path on the Gold Gulch No. 3 mining claim. Map E-2 shows <br /> the new location of the Pump Station and the fuel tank situated on the twelve foot Waterline <br /> Easement and the two (2) inch Pipeline up to the Times Mine portal that will be installed under <br /> the Mining Plan. Map E-3 shows the Pump Station and the fuel tank and the two (2) inch Pipeline <br /> that will be removed under the Reclamation Plan. Map E-4 has been revised to show all of the <br /> features from the Left Hand Creek to the Gold Hill Millsite and the property ownership adjacent <br /> to the Permit Area. Map E-5 shows the Gold Hill Millsite in relation to the Waterline as it enters <br /> the Times Mine portal. Maps E-3 and E-4 depict the entire affected area of the Gold Hill Mill <br /> operation. Map E-5 shows the Gold Hill Mill Reclamation on a scale of 1-inch=150-feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.