My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-17_REVISION - M1994117
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994117
>
2019-05-17_REVISION - M1994117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 5:46:07 AM
Creation date
5/20/2019 1:02:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
REVISION
Doc Date
5/17/2019
Doc Name
Adequacy Review #3
From
Colorado Milling Company
To
DRMS
Type & Sequence
AM1
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reclamation information for the Times Mine and the mill site on a map showing a closer view of <br /> those areas (i.e., Map E-5). Please be sure any mining plan and reclamation plan maps are <br /> labeled accordingly. <br /> CMC Response: As described above, the Wynona Mine shaft and the Times Mine drill hole will <br /> not be reclaimed or sealed in order to use these two features for emergency water sources for forest <br /> fire protection. Map E-5 has been amended to include the reclamation information for the Times <br /> Mine Portal,and to clearly show that the Wynona Mine drill hole is located inside a Concrete Well <br /> Enclosure. It also shows the location of the Times Mine Well Head, and that the Mill Pond will be <br /> reclaimed to a natural ground surface following reclamation. This map has been renamed E-5 <br /> Millsite — Colorado Milling Co. - Gold Hill Mill Reclamation. The scale on this map has been <br /> increased to 1-inch equals 150-feet to provide a closer view of these features. <br /> Exhibit L—Permanent Man-Made Structures (Rule 6.3.12): <br /> 15) The operator's response to item no. 30 included proof of hand-delivery of structure <br /> agreements to Xcel Energy(for the power poles and lines) and to Boulder County (for Lefthand <br /> Canyon Dr., Lickskillet Rd., and Sunshine Canyon Dr.). Please submit copies of the executed <br /> structure agreements, or per Rule 6.3.12(b), provide an appropriate engineering evaluation that <br /> demonstrates these structures will not be damaged by activities occurring at the mining <br /> operation. <br /> CMC Response: CMC is awaiting the signed Structure Agreements that were hand delivered to <br /> Xcel Energy and to Boulder County. CMC has been in communication with these two entities and <br /> believes that these Structure Agreements will be accepted and executed by the respective parties. <br /> These will be forwarded to the DRMS as soon as they are received from these two adjacent <br /> property owners. <br /> For the structures owned by Gene L. Sapp and Dene F. Sapp, the operator states they are covered <br /> by the Easement for Water Line with Access (submitted with the response) which grants the <br /> operator legal right of entry to their property, the Eureka Millsite, MS 601B to access the water <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.