My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-16_REVISION - M1983194 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2019-05-16_REVISION - M1983194 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:04:57 PM
Creation date
5/17/2019 4:16:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
5/16/2019
Doc Name
Request for Technical Revision
From
Natural Soda LLC
To
DRMS
Type & Sequence
TR43
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
op C0 <br /> COLORADO DIVI TION, MINING AND SAFETY <br /> 1313 Sherman Str< TR43 80203 ph(303)866-3567 <br /> � 0 <br /> THM � <br /> REQUEST FOR Th,_,nivi,,,AE tcEytJtut'i (TR) COVER SHEET = ca <br /> �� w <br /> File No.: M- 1983-194 site Name: Natural Soda Nahcolite Project <br /> County Rio Blanco TR# (DRMS Use only) <br /> Permittee: Natural Soda LLC <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Gerald Daub, Daub & Associates, Inc. <br /> RECE <br /> Please provide a brief description of the proposed revision: o <br /> See attached MAY 16 2019 =o 1� <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> QI <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the pe rt�or�M appla�(ication <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(l, 2 or 3) $1006 ❑✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.