My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-16_REVISION - M1983194 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2019-05-16_REVISION - M1983194 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:27:08 AM
Creation date
5/17/2019 2:16:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
5/16/2019
Doc Name
Request for Technical Revision
From
Natural Soda LLC
To
DRMS
Type & Sequence
TR43
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19851/2 SOUTH BROADWAY <br /> GRAND JUNCTION, CO 81507-9649 <br /> DAUB & ASSOCIATES, INC. � ` (970)254-1224 <br /> '-)i-5F;Z�— FAX )242-8438 <br /> email: 91daub970 @daubandassociates.com <br /> www.daubandassociates.com p <br /> May 15, 2019 RECEIVED <br /> Division of Reclamation, Mining and Safety MAY 16 2019 <br /> Attn: Minerals Division DIVISION OF RECLAMATION <br /> 1313 Sherman Street, Room 215 tVWNG AND SAFETY <br /> Denver, CO 80203 <br /> -fa115,1W ?�c�/l <br /> Re: Natural Soda LLC Nahcolite Project Permit No. M-1983-194 Technical Revision,Addition of Production Wells <br /> 15H-1V, 16H-1V, 17H-lV, 15H-IR-E, 16H-IR-E, and 17H-IR-E, and Pad Locations 15H-IV, 16-17H-IR-E, and 16- <br /> 17H-1V. <br /> Natural Soda LLC will drill one slant injection/recovery well, the 15H-1V, and one horizontal production well, the <br /> 15H-IR-E in 2019. The 15H-1V will be located on the currently bonded 7H-1V pad area. The 15H-IR-E will be <br /> located on the existing 10H pad. The 16H-IR-E and 17H-IR-E will be located on a new pad (15- 17H-IR-E) due south <br /> of the 10H pad, these two wells will be drilled in 2020. The 16 - 17H-1V pad will be constructed this year (partially <br /> on the reclaimed 1A-4H1 pad), however,the 16H-1V and 17H-1V wells will be drilled in 2020. <br /> Please find attached: <br /> 1) DRMS Form - Request for TR Cover Sheet <br /> 2) Location Map <br /> 3) Well construction diagrams (15H-IV, 16H-1V, 17H-1V, 15H-IR-E, 16H-IR-E, and 17H-IR-E) <br /> 4) Plat,cut and fill diagrams, location photographs for three well pad locations <br /> 5) Check#7482 for the filing fee ($1,006.00) <br /> Should you have any questions or comments, please contact me at (970) 254-1224 or (970) 216-1010 (c), or Kirk <br /> Daehling at (888)464-7632 ext. 114. <br /> Regards, <br /> Gerald J. Daub, PG, CPG <br /> President <br /> Daub &Associates, Inc. <br /> Cc: Kirk Daehling w/enc <br /> President <br /> Natural Soda LLC <br /> Kent Walters w/enc <br /> Bureau of Land Management (WRFO) <br /> Amy Yeldell (via email) <br /> Colorado Division of Reclamation, Mining and Safety <br /> File <br /> Daub&Associates, Inc. Page 1 of 1 17H-SSMW DRMS TR <br />
The URL can be used to link to this page
Your browser does not support the video tag.