Laserfiche WebLink
Table 6.4.5-1. Reclamation Earthwork Summary <br /> POND <br /> CLAY POND AREA WATER TOPSOIL 1 TOPSOIL <br /> TOTAL BACKFILL BACKFILL LINER (TOP OF SURFACE REVEGETATION REPLACEMENT <br /> MINING CELL AREA AREA VOLUME VOLUME SLOPE) AREA AREA VOLUME <br /> acres acres d3 d3 acres acres acres d3 <br /> CELL 1 21.0 8.8 214,036 33,700 11.7 12,578.9 <br /> POND 1 12.2 11.2 <br /> CELL 2 16.5 3.7 93,030 56,322 5.9 6,373.6 <br /> POND 2 28,872 80 68 <br /> R� , <br /> POND 3 27,450 4.7 4.2 <br /> CELL 3 19.2 4.7 180,784.1 46,693 14.5 9.2 7.0 7,535.9 <br /> CELL 4 3.8 0.0 0.0 15,427 4.0 3.4 0.6 632.3 <br /> CELL 6 13.6 3.7 134,506 34,874 9.9 13.5 6.2 6,724.3 <br /> POND 4 96,994 28.8 26.2 <br /> IF <br /> CELL 5 20.2 6.9 141,821 30,476 7.9 8,551.2 <br /> � x <br /> POND 5 13.3 12.2 <br /> l <br /> HAUL ROAD 0.3 0.3 313.6 <br /> Totals 97.4 30.6 764,177 370,808 95.6 86.7 39.6 42,709.6 <br /> Amen Aggregate Resource <br /> Specific Exhibits <br /> Page 10 of 44 <br />