My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-14_PERMIT FILE - M2019025 (15)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019025
>
2019-05-14_PERMIT FILE - M2019025 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 5:34:47 AM
Creation date
5/15/2019 9:31:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019025
IBM Index Class Name
PERMIT FILE
Doc Date
5/14/2019
Doc Name
Application
From
Coulson Excavating Company, Inc.
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.4 Exhibit D — Mining Plan <br /> (a) Description of Methods <br /> Mining will advance in the numeric sequence assigned to the mining cells. For a <br /> given cell, mining will generally start at the low point of groundwater elevation <br /> and advance toward higher groundwater elevations. In general, this results in the <br /> direction of mining occurring perpendicular to the flow of and away from the river. <br /> Mining will utilize conventional dry mining techniques whereby dewatering <br /> trenches are first constructed around the perimeter of the active excavation. <br /> Mining highwalls will vary from 0.5HAV to 3H:1V. Topsoil is then removed with <br /> an excavator and stockpiled separately from overburden. Overburden is then <br /> removed with an excavator, loaded into non-road haul trucks (rock trucks) and <br /> transported to an initial stockpile. The initial stockpile volume is expected to be <br /> between 20,000 — 30,000 yd3 corresponding to an initial cut of approximately 2-3 <br /> acres. Overburden from subsequent cuts in a given mining cell will be directly <br /> backfilled to the previously mined out excavation slated for backfilling (see <br /> Exhibit F-Reclamation Plan - Sheet 1). <br /> Extraction of pit run will occur by excavator, which sits on top of the unearthed <br /> gravel layer and loads rock trucks. The excavator generally advances 15ft strips <br /> back and forth along the active mining highwall. <br /> (b) Earthmoving <br /> The primary earthmoving activity will be: <br /> 1. Stripping of topsoil and stockpiling in areas shown in Exhibit C-2 Mining <br /> Plan Map <br /> 2. Excavation of overburden and hauling to the stockpile areas or to the <br /> backfill area. <br /> 3. Excavation of pit run and hauling to the processing plant area. <br /> Amen Aggregate Resource <br /> Specific Exhibits <br /> Page 5 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.