Laserfiche WebLink
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) <br />Page 9 of 558 <br />41A <br />45A <br />45B <br />45C <br />45D <br />45E <br />Nuclear Density Testing of Refuse <br />NA <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />320.00 <br />$23,401.60 <br />$128,585.00 <br />$9,081.00 <br />$41,542.00 <br />$7,541.00 <br />$44,583.00 <br />Distribute Gob Pile #2 cover hauled by T/L <br />DOZER <br />375.26 <br />Haul Cover Material from Borrow Area #1 to Gob Pile <br />#2 <br />TRUCKI <br />50.03 <br />Haul Cover Material from Borrow Area #2 to Gob Pile <br />#2 <br />TRUCKI <br />228.88 <br />Haul Cover Material from Borrow Area #3 to Gob Pile <br />#2 <br />TRUCKI <br />41.55 <br />Haul Cover Material from B Portal Storage to Gob Pile <br />#2 <br />TRUCKI <br />108.83 <br />SUBTOTALS: <br />15936.48 <br />$9,728,979 <br />INDIRECT COSTS <br />1LTIaA:IDl:\I7:101�l�:Z�J�11 <br />Liability insurance: 2.02% <br />Total = <br />$196,52538 <br />Performance bond: 1.05% <br />Total = <br />$102,154.28 <br />Job superintendent: 3,114.00 hrs <br />Total = <br />$234,048.24 <br />Profit: 10.00% <br />Total = <br />$972,897.90 <br />TOTAL O & P = <br />$1,505,625.80 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$11,234,604.80 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% <br />Total = <br />$449,384.19 <br />Reclamation management and /or administration: <br />3.13% <br />$351,643.13 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$2,306,653.12 <br />TOTAL BOND AMOUNT (direct + indirect) = $12,035,632.12 <br />