Laserfiche WebLink
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) Page 17 of 558 <br />BULLDOZER WORK <br />Task description: Regrade Utility Corridor <br />Site: Bowie No. 2 Mine Permit Action: Midterm Review 4 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: <br />Date: 10/2/2014 County: <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown <br />Cat D10T - IOSU <br />574 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C083 -004 <br />Total unit Cost/Hour: $342.65 <br />Total Fleet Cost/Hour: $1,370.61 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />13,386 <br />1.000 <br />13,386 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY /hr <br />production: <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight <br />0% <br />6,500 feet <br />2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$120.17 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $342.65 <br />Total Fleet Cost/Hour: $1,370.61 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />13,386 <br />1.000 <br />13,386 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY /hr <br />production: <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight <br />0% <br />6,500 feet <br />2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.100 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />