Laserfiche WebLink
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) Page 14 of 558 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />0.786 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2794 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />480.26 LCY /hr <br />1921.04 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.713 /LCY <br />Total job time: <br />Total job cost: <br />158.03 Hours <br />$216,603 <br />