My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-08_PERMIT FILE - C1996083 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2019-05-08_PERMIT FILE - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 9:49:32 AM
Creation date
5/15/2019 8:26:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
5/8/2019
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
559
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) <br />Return Route: <br />Page 12 of 558 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 563.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />(min) <br />1 <br />600.00 <br />-17.00 <br />3.00 <br />-14.00 <br />1377 <br />0.566 <br />minutes <br />minutes <br />498.74 LCY/Hour <br />281.60 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 609.56 Hours <br />Unit cost: $1.370 /LCY Total job cost: $416,433 <br />Return Time: 0.566 <br />Total Truck Cycle Time: 7.474 <br />Loading Tool unit <br />Production 600.89 <br />LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />339.28 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 2 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 563.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />JOB TIME AND COST <br />minutes <br />minutes <br />498.74 LCY/Hour <br />281.60 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 609.56 Hours <br />Unit cost: $1.370 /LCY Total job cost: $416,433 <br />
The URL can be used to link to this page
Your browser does not support the video tag.