My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-14_PERMIT FILE - M2019010
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019010
>
2019-05-14_PERMIT FILE - M2019010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:06:57 PM
Creation date
5/14/2019 11:16:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019010
IBM Index Class Name
PERMIT FILE
Doc Date
5/14/2019
Doc Name
Completeness Response
From
Horsefly Rock SOurce
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table C-I Mining Area Material Table <br /> Year Phase Activity Tons <br /> 2019 Phase Stripping, Mining and Stockpiling 7000 <br /> 2020 Phase Stripping, Mining and Stockpiling 7000 <br /> 2021 Phase Stripping, Mining and Stockpiling 7000 <br /> 3023 Phase Stripping, Mining and Stockpiling 7000 <br /> 2033 Phase Stripping, Mining and Stockpiling 7000 <br /> 2024 Phase Stripping, Mining and Stockpiling 7000 <br /> 2035 Phase Stripping, Mining and Stockpiling 7000 <br /> 2036 Phase Stripping, Mining and Stockpiling 7000 <br /> 2027 Phase Stripping, Mining and Stockpiling 7000 <br /> 3028 Phase Stripping, Mining and Stockpiling 7000 <br /> 2029 Phase Reclamation and start of Phase 2 <br /> Total Phase 1 70000 Tons <br /> 2039 Phase Stripping, Mining and Stockpiling 7000 <br /> 2030 Phase Stripping, Mining and Stockpiling 7000 <br /> 2031 Phase Stripping, Mining and Stockpiling 7000 <br /> 2032 Phase Stripping, Mining and Stockpiling 7000 <br /> 2033 Phase Stripping, Mining and Stockpiling 7000 <br /> 3034 Phase Stripping, Mining and Stockpiling 7000 <br /> 2035 Phase Stripping, Mining and Stockpiling 7000 <br /> 2036 Phase Stripping, Mining and Stockpiling 7000 <br /> 2037 Phase Stripping, Mining and Stockpiling 7000 <br /> 3038 Phase Stockpile Loadout and Reclamation <br /> 2039 Phase Reclamation <br /> 3040 Phase Reclamation <br /> Total Phase 2 63000 Tons <br /> The material volumes described in Table C-1 are approximate and are based mo existing sales <br /> projections.Note that the areas above are located in the mining area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.