My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-13_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2019-05-13_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2019 9:48:24 AM
Creation date
5/13/2019 9:22:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
5/13/2019
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company
Type & Sequence
MR202
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />COST SUMMARY WORK <br /> <br />Task description: Reclaim Ditch CWD-1 <br />Site: Colowyo Coal Mine Permit Action: MR202 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 5/10/2019 County: Moffat Filename: C019-000 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Regrade Ditch CWD-1 DOZER 1 12.95 $2,415 <br />002 Regrade Topsoil for Ditch CWD-1 DOZER 1 5.50 $2,670 <br />003 Reseed Ditch CWD-1 REVEGE 1 4.30 $1,202 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />22.75 <br /> <br />$6,287 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $127 <br />Performance bond: 1.05 Total = $66 <br />Job superintendent: 13.09 Total = $956 <br />Profit: 10.00 Total = $629 <br /> TOTAL O & P = $1,778 <br /> CONTRACT AMOUNT (direct + O & P) = $8,065 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): $0 Total = $0 <br />Engineering work and/or contract/bid preparation: 2.00 Total = $161 <br />Reclamation management and/or administration: 1.91 $154 <br /> <br />CONTINGENCY: 0.00 Total = $0 <br /> <br />TOTAL INDIRECT COST = $2,093 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $8,380 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.