My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-09_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-05-09_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:24:24 AM
Creation date
5/10/2019 9:45:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/9/2019
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR114
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br /> Foundations&Buildings <br /> Project Name: Silo-Reclamation Plan <br /> Date of Submittal: 5/6I2019 <br /> File Name: SRCE for Silo V2.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data_NMC_20209BP_17Apr.xlsm <br /> Cost Estimate Type:ARO Cost Basis:Newmont CC&V FASB <br /> Buildings&Foundation Demolition Cost Summary <br /> Labor Lquipment Materials Totals <br /> Building Demolition Cost $741 $544 N/A $1,285 <br /> Wall Demolition Cost $5,630 $427 N/A $6,057 <br /> Slab Demolition $224 956 N/A $1,180 <br /> Subtotal Demolition $6,595 $1,927 $0 $8,522 <br /> Cover Placement Cost $0 $0 N/A $0 <br /> Growth Media Placement Cost $0 $0 N/A $0 <br /> Ripping/Scarifying Cost $0 $0 N/A $0 <br /> 0 Subtotal Earthworks $ $0 $0 $0 <br /> Revegetation Cost $0 $0 Sol $0 <br /> TOTALS $6,5951 $1,927 $0 $8,522 <br /> Buildings&Foundation-User Input(cont.) You must fill in ALL green cells and relevant blue cells in this section for each building or facility <br /> Construction Materials Slab Demolition Foundation Cover Growth Media Revegetation <br /> Stab <br /> Breaking Cover Growth Media <br /> Description Foundation Wall Slab Demo Equipment Cover Placement Maximum Growth Media Placement Maximum <br /> (required) Build inq Type Type Method Fleet Material Type Equipment Fleet Fleet Size Material Type Equipment Fleet Fleet Size Seed Mix Mulch Fertilizer Scanty/Rip? Ripping Fleet <br /> Iselec0 select/ (select) (select) (select) (select) (us ernde) (select) (select) (user override) (select) (select) (select) (select) (select) <br /> 1 Silo L .steel Conic 12 in 300 mm thick Break&bury Lg Excavator _ <br /> 2 Conveyor Supports Lg.concrete Cone 12 in(300 mm)thick Break&bury Lg Excavator <br /> Notes: <br /> 1.Material Types are used for density correction based on material densities in Caterpillar Performance Handbook material density table <br /> 5/7/2019 <br /> Page 2 of 6 Foundations 8 Buildings <br />
The URL can be used to link to this page
Your browser does not support the video tag.