My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-07_PERMIT FILE - M2018052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018052
>
2019-05-07_PERMIT FILE - M2018052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:51:58 AM
Creation date
5/8/2019 2:45:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018052
IBM Index Class Name
PERMIT FILE
Doc Date
5/7/2019
Doc Name
Completeness Response
From
Steve Hunter
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future(Post-mining)land use (check one): <br /> Cropland(CR) rl Pastureland(PL) General Agriculture (GA) <br /> angeland(RL) F Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) - Recreation(RC) Industrial/Commercial(IC) <br /> Pleasegrovide a eneral descr�'ptin of how the mined area will be Reclaimed:2 r -�-� 'Vee 91'/lc�h f r0�vCe4 CZoo 8: Pf Couered(/ 'wfA Z~ 6ety, <br /> LL d v{ v l r7 s CcQ c to rC 20© a V'j �i � <br /> 3YAlff &brtfro <-V l os <br /> c Al c i% i✓1 i c( So ,,r a 0 r 1,v r -1$b vrcq vNGo✓e r*&'P, <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 2, H: 2 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V(example 1 H:1 V, 2H: 1 V, etc.), please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> No 4 P <br /> 4) eipth of topsoil to be salvaged(only for surface disturbances) (check one): <br /> 4-6 inches 6-8 inches <br /> 8-10 inches 10-12 inches <br /> Other: <br /> N/A, explain: AL-L. SUrfq CQ Q o 4 v r�aM C[-a 1`y 7��t Q 9��v�►/ <br /> we re- e_fwe e,✓ 1061 �-# / <br />
The URL can be used to link to this page
Your browser does not support the video tag.