My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-07_PERMIT FILE - M2018052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018052
>
2019-05-07_PERMIT FILE - M2018052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:51:58 AM
Creation date
5/8/2019 2:45:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018052
IBM Index Class Name
PERMIT FILE
Doc Date
5/7/2019
Doc Name
Completeness Response
From
Steve Hunter
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: A19Vef and completion: AkVer f <br /> 2) How many years is the mine anticipated to be operational: & years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> (0) all-yearlong or(]:]j seasonally,explain: /V° lC r <br /> 4) How many aces of the mine site will be disturbed at any given time: acres <br /> 5) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches =6-8 inches <br /> _[Z 8-10 inches _fD_10-12 inches <br /> Other: <br /> N/A, explain: _0 mw;,_ a S d/ W,l/ be PQr��MeaP, <br /> 6) Will you need to move any overburden (check one): (=)Yes or(_a)No <br /> a. If yes, approximately how thick is the overburden? feet <br /> 7) How will the mine be accessed: t.L ) existing roads (a)new roads will be created <br /> Please describe the existing roads: <br /> �A __�00_f G, �i�o M �'!� �/'/rt r�r e s r ye °I D proX��►'l ( <br /> /�- PI'l L'e_ , <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> 8) Will water be needed during the mining operation (check one): (=)Yes or(�)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (11)Yes or(JEL)No <br /> a. If yes, please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process (check one): (=)Yes or( )No <br /> a. If yes,please describe the chemical types and quantities to be utilized,the ical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.