My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-03_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2019-05-03_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 9:21:16 AM
Creation date
5/6/2019 9:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
5/3/2019
Doc Name Note
For MT7
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Molson Coors Brewing Company
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br /> <br />Task description: Clean sediment from Pond 2, dispose in B-Pit <br />Site: Keenesburg Strip Mine Permit Action: MT7 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION <br />Task #: I01 State: Colorado Abbreviation: None <br />Date: 4/11/2019 County: Weld Filename: C81028 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Generic 12-18 cy, 6x4 <br />-Loader: Cat 320D L 9’-6” Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization-machine: 100 100 NA NA 25 25 <br />Ownership cost/hour: $22.72 $33.90 NA NA $60.13 $12.39 <br />Operating cost/hour: $44.95 $36.00 NA NA $12.72 $6.50 <br />%Utilization-riper: NA 0 NA NA NA NA <br />Ripper own. <br />cost/hour: NA $0.00 NA NA $0.00 $0.00 <br />Ripper op. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br />Operator cost/hour: $25.65 $36.93 NA NA $45.64 $0.00 <br />Unit Subtotals: $93.31 $106.84 NA NA $118.49 $18.89 <br />Number of Units: 3 1 0 0 1 1 <br />Group Subtotals: Work: $386.77 Support: $0.00 Maint: $137.38 <br />Total work team cost/hour: $524.15 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 486 CCY Swell factor: 1.000 <br />Loose volume: 486 LCY <br />Source of estimated volume: Coors Site Plan; assume 4” deep sediment <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00
The URL can be used to link to this page
Your browser does not support the video tag.