My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-03_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2019-05-03_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 9:21:16 AM
Creation date
5/6/2019 9:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
5/3/2019
Doc Name Note
For MT7
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Molson Coors Brewing Company
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br /> <br />Task description: Final Grade Long-Term Spoil Area <br />Site: Keenesburg Strip Mine Permit Action: MT7 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION <br />Task #: A03 State: Colorado Abbreviation: None <br />Date: 4/11/2019 County: Weld Filename: C81028 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M Horsepower: 259 <br />Ripper Attachment: Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $60.13 NA <br />Operating Cost/Hour: $50.87 100 <br />Ripper Ownership Cost/Hour: $0.00 NA <br />Ripper Operating Cost/Hour: $0.00 <br />Operator Cost/Hour: $45.64 NA <br />Total Unit Cost/Hour: $156.64 <br />Total Fleet Cost/Hour: $156.64 <br /> <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 42.94 acres <br />Source of estimated acreage: 2018 ARR <br /> <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.50 mph <br />Selected Application: Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 12.10 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 10.10 feet <br />Unadjusted Hourly Unit Production: 1.8364 acres/hour <br />Job Condition Correction Factors Site Altitude: 4000 feet <br /> Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fav.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: 1.6527 acres/Hour <br />Adjusted Hourly Fleet Production: 1.6527 acres/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 25.98 Hours <br /> <br />Unit cost: <br /> <br />$94.78 <br /> <br />per acre <br /> <br />Total job cost: <br /> <br />$4,070 <br />
The URL can be used to link to this page
Your browser does not support the video tag.