Laserfiche WebLink
SCRAPER TEAM WORK <br /> <br />Task description: Backfill B-Pit <br />Site: Keenesburg Strip Mine Permit Action: MT7 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: A01 State: Colorado Abbreviation: None <br />Date: 4/11/2019 County: Weld Filename: C81028 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA 100 NA 25 25 <br />Ownership cost/hour: $165.84 NA $110.70 NA $60.13 $12.39 <br />Operating cost/hour: $172.14 NA $95.46 NA $12.72 $6.50 <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA $0.00 NA $0.00 $0.00 <br />Ripper op. cost/hour: NA NA $0.00 NA $0.00 $0.00 <br />Operator cost/hour: $45.84 NA $40.23 NA $45.64 $39.10 <br />Unit Subtotals: $383.81 NA $246.39 NA $118.49 $57.99 <br />Number of Units: 4 0 1 0 1 1 <br />Group Subtotals: Work: $1,535.24 Support: $246.39 Maint: $176.48 <br />Total work team cost/hour: $1,958.11 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 254,971 CCY Swell factor: 1.124 <br />Loose volume: 286,486 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 2,850 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: Sand - Damp Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 28.63 LCY Adjusted Capacity: 28.63 LCY <br /> <br />