My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-03_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2019-05-03_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 9:21:16 AM
Creation date
5/6/2019 9:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
5/3/2019
Doc Name Note
For MT7
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Molson Coors Brewing Company
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br /> <br />Task description: Backfill B-Pit <br />Site: Keenesburg Strip Mine Permit Action: MT7 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: A01 State: Colorado Abbreviation: None <br />Date: 4/11/2019 County: Weld Filename: C81028 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA 100 NA 25 25 <br />Ownership cost/hour: $165.84 NA $110.70 NA $60.13 $12.39 <br />Operating cost/hour: $172.14 NA $95.46 NA $12.72 $6.50 <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA $0.00 NA $0.00 $0.00 <br />Ripper op. cost/hour: NA NA $0.00 NA $0.00 $0.00 <br />Operator cost/hour: $45.84 NA $40.23 NA $45.64 $39.10 <br />Unit Subtotals: $383.81 NA $246.39 NA $118.49 $57.99 <br />Number of Units: 4 0 1 0 1 1 <br />Group Subtotals: Work: $1,535.24 Support: $246.39 Maint: $176.48 <br />Total work team cost/hour: $1,958.11 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 254,971 CCY Swell factor: 1.124 <br />Loose volume: 286,486 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 2,850 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: Sand - Damp Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 28.63 LCY Adjusted Capacity: 28.63 LCY <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.