My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-24_HYDROLOGY - M1997058
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1997058
>
2019-04-24_HYDROLOGY - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 12:23:05 PM
Creation date
5/2/2019 12:22:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
Hydrology
Doc Date
4/24/2019
Doc Name
Substitute Water Supply Plan
From
DWR
To
Civil Resources, LLC
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Andy Rodriguez, P.E. <br />Beltway's Brighton Combined SWSP <br />April 24, 2019 <br />Page 5 of 6 <br />stream flow. <br />11. The State Engineer may revoke this SWSP or add additional restrictions to its operation <br />if at any time the State Engineer determines that injury to other vested water rights <br />has occurred or will occur as a result of the operation of this SWSP. <br />12. Dewatering is not expected to occur at these sites during the period of this SWSP, <br />therefore dewatering shall not occur unless an amendment to this SWSP is approved. <br />13. To assure that depletions from groundwater evaporation do not occur in the <br />unforeseen event, or events, that would lead to the abandonment of the pits, a bond <br />through DRMS, in the amount of $974,000.00 for the Parker-Dersham Pit and <br />$711,750.00 for the Baseline Pit, for lining or backfilling of the each pit has been <br />obtained. Therefore, in case of abandonment the bond can finance the completion of <br />the lining of the pit or the backfilling, thus preventing depletions to the stream <br />system. <br />14. In accordance with amendments to Section 525-8-202-(7), C.R.S. and "Senate Bill <br />89-181 Rules and Regulations" adopted on February 4, 1992, the State Engineer shall <br />determine if this substitute water supply plan is of a quality to meet requirements of <br />use to which the senior appropriation receiving the substitute supply has normally <br />been put. As such, water quality data or analyses may be requested at any time to <br />determine if the requirement of use of the senior appropriator is met. <br />15. The decision of the state engineer shall have no precedential or evidentiary force, <br />shall not create any presumptions, shift the burden of proof, or serve as a defense in <br />any water court case or any other legal action that may be initiated concerning the <br />substitute water supply plan. This decision shall not bind the State Engineer to act in <br />a similar manner in any other applications involving other plans or in any proposed <br />renewal of this plan, and shall not imply concurrence with any findings of fact or <br />conclusions of law contained herein, or with the engineering methodologies used by <br />the Applicant. <br />Should you have any questions, please contact Ailis Thyne of this office or Dean <br />Santistevan of our Division office in Greeley at (970) 352-0742. <br />Sincerely, <br />for <br />Jeff Deatherage, P.E. <br />Chief of Water Supply <br />Attachments: Figure 1 <br />Tables 1 &t 3 <br />City of Aurora Lease <br />
The URL can be used to link to this page
Your browser does not support the video tag.