,5toner Engineering & ,5urveying <br />Engineering. Teeing & Surveying <br />Date: April 2, 2019 <br />To: Jordan McCourt <br />Project Coordinator <br />GCC Energy, LLC <br />6473 County Road 120 <br />Hesperus, CO 81326 <br />(970) 385-4528 <br />From <br />Ryan Griglak, P.E. <br />Project Manager <br />Stoner Engineering & Surveyi�,5 <br />Re: King Coal I — Quarterly Waste Pile/Embankment Inspection <br />On March 30, 2419, Ryan Griglak, P.E. visited the GCC Energy, LLC King I Mine site to conduct <br />the quarterly inspection of the coal waste pile/embankment. Mr. Griglak, P.E. has conducted <br />inspections for the placement of earthwork embankment fill material for numerous <br />commercial, residential and municipal projects in which buildings, roadways and parking <br />facilities were installed over the placed materials. <br />Maintenance operations were ongoing at the site at the time of the inspection as a result of the <br />snow/moisture levels from the time of the last inspection. The south treated water ditch was <br />found to be in generally good condition though the culvert inlet under the haul road near the <br />base of the pile needs to be cleaned out and any sediment within the culvert removed (see Pic. <br />1). The north clean water ditch is still in need of additional cleaning as well as some additional <br />drainage/embankment work near the new culvert inlet along the north switchback in the haul <br />road (see Pic. 2). This will ensure that treated water runoff cannot erode/infiltrate the north <br />clean water ditch and bypass the sediment ponds. Work is scheduled to begin shortly to <br />relocate the upper portion of the clean water ditch to accommodate the placement of <br />additional waste material. <br />The culvert under the haul road located at the top of the waste pile was damaged during <br />ongoing operations and was in the process of being repaired at the time of the inspection (see <br />Pic. 3). The pipe that drains into Reach 10 is clear of debris/sediment and appears to be <br />functioning as designed, <br />There is significant embankment fill material stockpiled at the base of the waste <br />pile/embankment (see Pic. 4) waiting to be placed once the road/drainage repairs have been <br />completed. Waste material has been installed at the top of the waste pile (see Pic. 5) as <br />P.O. Box 1163 28 South Washington Street Cortez, Colorado 81321 <br />970.5565.7483 s_t_onerengineer@frontier.net 970,565.7704 <br />