My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-19_REVISION - C1981019 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2019-04-19_REVISION - C1981019 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 12:48:03 PM
Creation date
5/1/2019 10:11:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/19/2019
Doc Name
Adequacy Review Response
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
MR201
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-23 Revision Date: 4/29/19 <br /> Revision No.: MR-201 <br />This plan remains essentially unchanged except for the following changes: <br /> <br />1. 6900 North Well - Streeter Fill - During the summer of 1984, the shallow 6900 north <br />well collapsed. It was later determined that since this. well monitored only a small <br />perched zone within the fill, reestablishment of the well would not be necessary. Refer <br />to the 1984 Annual Report for additional details. <br /> <br />2. 6900 South Well - Streeter Fill - It was noted on March 21, 1986 that this piezometer <br />well had also collapsed. This well was reestablished in the fall of 1986. For further <br />details concerning this well, refer to the 1986 Annual Report. <br /> <br />3. New Upper Good Spring Creek Surface Water Monitoring Site This site replaced the <br />Upper Good Spring Site to allow for mine expansion. Monitoring shall utilize any <br />equipment, structures, devices or methods necessary to measure and sample accurately <br />the quality and quantity of surface water. Refer to Map 10B for site location. <br /> <br />These commitments have satisfied the requirements of Stipulation 1 in the Findings document. <br /> <br />4.05.14 Transfer of Wells <br /> <br />Colowyo does not plan to transfer any monitoring wells to water wells. <br /> <br />The 13 permitted and bonded wells (11 monitoring and 2 potable) include TC-1, TC-3, North <br />Goodspring Well, A-6 Well, A-3 Well, Gossard #1 Well, 5 Streeter Fill Wells (W6900S, <br />W6900N, W6700 and two collapsed piezometer wells), Section 16 Fill well, and the West Pit <br />Fill well. <br /> <br />4.05.15 Water Rights and Replacement <br /> <br />Colowyo, if necessary, will replace the water supply of any owner of interest in real estate who <br />obtains all or part of a supply of water for domestic, agricultural, industrial or other legitimate use <br />from an underground or surface source where the water supply has been affected by the mining <br />operation. <br /> <br />Colowyo does not anticipate that any water supply or water right of any owner of interest will be <br />affected by the mining operation. Detailed information on the Colowyo augmentation plan is set <br />forth in the Hydrology Information Exhibit (Exhibit 7). <br /> <br />4.05.16 Discharge of Water into an Underground Mine <br /> <br />No surface water will be diverted into any underground mine workings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.