My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-25_PERMIT FILE - M2018052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018052
>
2019-04-25_PERMIT FILE - M2018052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:24:54 AM
Creation date
4/26/2019 1:45:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018052
IBM Index Class Name
PERMIT FILE
Doc Date
4/25/2019
Doc Name
Application
From
Steve Hunter
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 3 <br /> EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E -Map. <br /> 1) Primary future (Post-mining) land use (check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture (GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential (RS) Recreation(RC) Industrial/Commercial (IC) <br /> ti/2oo' -Orm Shif s, � <br /> 2) Please provide a general description of how the mined area will be Reclaimed: _ <br /> A� P0wNSi� aviL�/N� &eut, PA houses �l� < 2-oo ya' of (A;4 7�M <br /> Owe&4 wyr LNLi; i O vim/W a/V-T-- <br /> W /t` taw i v✓! e v ✓�ii /� o O �tiiti S�L� 694 <br /> e s na-,k'i <br /> G F LIM fA14,t& fhe- IlAeL46,1, 61'1 f tt atf �ke ^4-- <br /> 3) hat will the final grade of the reclaimed slopes (Horizontal:Vertical): H: V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V(example 1 H:1 V, 2H: 1 V, etc.), please <br /> include a justification: - L / <br /> a. Please provide a general description of the backfilling and grading: <br /> Afv1✓2 <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches �_6-8 inches <br /> 8-10 inches �_ 10-12 inches <br /> Other: <br /> N/A, explain: _'Re_ /1>°�r' t Sly v l6Z a34, `fo,0 f O/L <br />
The URL can be used to link to this page
Your browser does not support the video tag.